PLANT TOUR
Five stops, and none of
them a meeting room.
A supplier audit is usually a walk through a building looking for the gap between the brochure and the floor. Here is the route we would take you on, in the order the work actually flows.
01
The die shop
Where every part starts. Tool steel cut on slow-wire EDM, CNC machined, heat-treated and coated on-site - plus the repair bench that keeps running dies running.
02
The forming hall
Ten 6-station cold-heading platforms, the cold extrusion presses, the hot and warm forging lines, and the progressive and fine-blanking lines. Worth watching the slug go in and come out.
03
The machining cells
Turning, milling, hole-making, broaching and grinding. This is where the tolerance from your drawing is either held or lost, so it is where we will spend the most time with you.
04
Heat treatment and finishing
Spheroidising before forming, carburising, induction hardening and tempering after; then phosphate, black oxide and rust prevention. All on the same site as the machining.
05
Metrology and inspection
Where the first article, the PPAP file and the lot records are produced. Ask to see the report for a part similar to yours, with the heat number still attached to it.
VIRTUAL TOUR
Eighteen stops, walked
from your desk.
The whole site is shot and stitched into a 360° tour, in the order the work moves: the gate and the front desk, the laboratory, cold heading, cold extrusion, stamping, the CNC shops, the hardware shop, laser cutting, cutting to length, annealing, cleaning and phosphating, the die rack, and the finished goods warehouse. It opens in the browser - no plugin, no headset, and it works on a phone.
Bolong Forming Hall 360 Virtual Tour
 
▶ Play the plant tour Eighteen stops · 360° · No plugin
FORMING HALL · 1 OF 18 STOPS ON THE TOUR
COMPANY WALL · COMPANY GATE · FRONT DESK · LABORATORY · COLD HEADING WORKSHOPS · CLEANING & OILING · DIE RACK · DIE HARDWARE ROOM · LASER CUTTING · CUTTING-TO-LENGTH WORKSHOP · STAMPING WORKSHOP · CNC WORKSHOP · CNC WORKSHOP 2 · HARDWARE WORKSHOP · ANNEALING · CLEANING & PHOSPHATING · FINISHED GOODS WAREHOUSE
The tour is hosted by the studio that produced it, so nothing loads until you press play. If your network blocks third-party frames, open it in a new tab.
Binhai New Area, Fenghua, Ningbo Plant
BINHAI NEW AREA, FENGHUA, NINGBO
PRACTICAL
Before you book the flight.
Plant
No. 21 Binhai Road, Binhai New Area, Fenghua Economic Development Zone, Ningbo, Zhejiang, China
Floor area
20,000 m² on one site - forming, machining, heat treatment, finishing and the tool room
Nearest airport
Ningbo Lishe International Airport (NGB)
By rail
Fenghua railway station, on the Ningbo–Wenzhou line
Bring with you
The drawing, the current supplier's inspection record, and the tolerances your quality team watches closest
Before you travel
A similar part from our own MES records is arranged first, so the visit is spent on the part rather than an introduction
Tell us which processes matter to your part when you write, and we will have the relevant line running and the right engineer in the building that day.
Book a visit. Bring
the drawing.
Tell us the part and the processes you want to see, and we will arrange the day around that line rather than around a slide deck.
Email us a date Chat on WhatsApp
NDA available on request