01
Before the quote
What we need, how fast we answer, and what we will not ask you for.
What do you need from me to
give a useful quote? +
Four
things decide most of the answer: material and grade, annual volume, the tolerance class on the functional
features, and whether you want a formed blank or a finished part. Add the drawing and we can usually come
back with a route, not just a price.
If a number is missing we ask for it rather than assume. An assumption written into a quote becomes a
revision six weeks later.
Will you sign an NDA before I
send a drawing? +
Yes -
send your template or ask for ours, either is fine.
Nothing on the route is subcontracted, so the drawing does not travel outside the plant, and the people who
read it are the people who will run the job.
How quickly will I hear
back? +
Within
24 hours you get a reply with the forming route we would use, or with the questions that decide it. A price
against that route follows once the route is agreed.
Can you quote from a sample
part instead of a drawing? +
Yes, if
it can be measured. We reverse-engineer the geometry, then tell you which features we need a tolerance for
before quoting.
A sample gives the shape. It does not give the intent - which face locates, which clearance matters, whether
the thread is a datum. That has to come from you.
02
Tooling and development
Who pays for the die, how long it takes, and what a drawing change costs.
Is tooling quoted separately,
and who owns it? +
Tooling
is a separate line on the quote, so the die cost is visible instead of being hidden in the piece price. Dies
are designed, cut, heat treated, coated and repaired in our own shop.
Title and custody are agreed in writing before the first cut. Put your requirement in the purchase order and
that is what we work to.
How long does a new die
take? +
Development runs in weeks rather than months, because nothing in the chain waits at a third party: design,
wire EDM, heat treatment and coating sit in the same building as the presses.
The exact figure depends on the die family. A single-station forming die and a progressive die with several
stations are not the same job, and we quote them as different jobs.
My drawing changes after the
die is cut. What then? +
For most
changes that is a die repair, not a new program. The toolroom can alter, re-cut or add a station, and the
cost is quoted against the change itself.
This is the main reason the die shop is in-house rather than outsourced: a change asked for on Monday is
measured against a die we can put our hands on.
Can you run a small first
lot? +
Yes, and
it is quoted as its own line so the sample cost does not hide in the production price.
Whether a small lot is economic depends on the process rather than on a minimum order figure: a turned or
milled part carries no tooling to amortise, while a cold-headed part needs its die first. We will tell you
which side of that line your part sits on before you commit.
03
Quality, documents and traceability
What ships with the first lot, and how far back a delivered part can be traced.
What documents come with the
first lot? +
PPAP
Level 3 by default: dimensional report, material and performance test results, process FMEA, control plan,
and the measuring-system study where the drawing calls for one.
If your program needs a different level or a different submission format, say so at the enquiry - the route
is built to it from the start, not retro-fitted later.
Which management systems is the
plant certified to? +
IATF
16949:2016 is the one automotive buyers ask about, and it is the one the plant is audited against.
The other systems are listed on the quality page together with their scope, so you can check the certificate
number and the validity date instead of taking a logo on trust.
Can you trace a delivered part
back to the heat? +
Yes.
Traceability runs by heat number from incoming material through forming, heat treatment and finishing to the
packing list.
In practice that means a delivered lot can be tied to its material certificate and, if it ever came to it,
to the parts made either side of it on the same coil.
What happens if a lot arrives
out of tolerance? +
It is
contained first: we ask for the lot number and the measurement, and quarantine whatever we still hold of
that lot.
Root cause goes back to the operation that made the feature, not to the inspection that missed it. The
report comes with the replacement lot.
04
Volume, process and freight
Which process, which volume, and how it leaves the plant.
Which process should my part
use? +
Three
things decide it: annual volume, geometry, and where the tolerance sits.
High volume on a rotational shape points to cold heading or extrusion. A thin flat part that needs a square
edge points to fine blanking or a progressive die. Low volume with tight features points to machining from
bar. We quote the route we would take and tell you what the alternative would cost, so the choice is yours
with both numbers in front of you.
What materials do you work
in? +
Carbon
steels (20#, 45#), alloy steels (40Cr, 35CrMo), stainless 304, copper (C1100, C2680), brass H62, and
aluminium 6061 / 6082 on the machining side.
The material usually comes from your drawing. If a grade is hard to source in the form a process needs -
wire for cold heading, strip for fine blanking - we say so before quoting rather than substituting quietly.
Do you subcontract any
operation? +
No.
Eighteen processes sit inside one 20,000 m² plant, from the die shop through forming, machining, heat
treatment and finishing.
That is also why no tolerance falls between two companies' inspection reports: there is only one report.
Can you supply a blank only, or
must it be a finished part? +
Either.
Some customers take the formed blank and machine it in their own plant; others take the finished,
heat-treated and coated part.
Both are quoted on the same drawing, and the difference between the two prices is usually the clearest
argument for one or the other.
What about packing and
freight? +
Packing
is quoted with the part: sea-worthy cartons and plywood cases, with rust prevention applied before packing
rather than after.
Freight terms and the port are agreed per order. Tell us at the enquiry if the part has to survive a long
sea leg - on a phosphate or blasted surface that is a process decision, not a packing afterthought.