THE
PEOPLE
300+ people, 30+
of them engineers.
of them engineers.
The plant runs on shift labour like any other, but the part of it a customer actually deals with is small:
the engineer who set the route, the toolmaker who cut the die, the quality engineer who signs the first
article, and the person who owns the delivery date.
Engineering sits across two provincial R&D centers and holds 46 invention and utility patents on
machining techniques and die design. That is where a running change becomes a drawing revision instead of a
new supplier negotiation.
✓
30+ engineers
Across two provincial R&D centers.
✓
46 patents
Invention and utility patents on forming and tooling.
✓
One owner per job
A named contact from enquiry to series delivery.
FUNCTIONS
Who you end
up talking to.
up talking to.
ENGINEERING
Process and part design
Reads the drawing, decides the route, and says so when a part should be machined rather than formed. This
is the group that answers your technical questions before the quote.
TOOLING
Die design and the tool room
Die design, tool steel and carbide selection, wire EDM, coating and repair. Six die families, all of it
made here, all of it validated on our own lines.
QUALITY
Metrology, PPAP and audit
First article, capability studies, control plans and the PPAP file. Also the people your quality team will
actually correspond with.
PROGRAM
Quotation and delivery
One person owns your job from enquiry through first article to series delivery, and answers for the date
rather than forwarding the question.
PRODUCTION
Shift supervision on the floor
Who the MES data belongs to, and who stops the line. They are the reason a formed feature stays in
tolerance across a run.
Send a drawing. Get a
process recommendation,
not just a price.
process recommendation,
not just a price.
PDF, STEP or DWG with material, annual volume and tolerance class. You will hear back within 24 hours with
the forming route we would use, and why.



